York's sewer system is comprised of a series of pump stations at strategic sites throughout our town that pump wastewater through miles of pipes to the treatment plant facility on Bay Haven Road. Here's an overview of the process that identifies the pump stations and major steps in the wastewater treatment process. 

This information is also available in our downloadable Wastewater Treatment Facilities System Overview Brochure PDF, below.

Wastewater Treatment Facilities System Overview with Downloadable PDF 

Wastewater Treatment The York Sewer District provides sewer service to approximately 5,200 residential and commercial customers. The District was founded in 1951 and the Treatment Facility was constructed in 1977 with major updates completed in 1994. Since that time, several components of the facility have been replaced with new, more efficient systems.

Protecting York’s Coastline Treated wastewater (effluent) from the wastewater treatment facility discharges to Cape Neddick Harbor. Nearby beaches and harbors are active with swimming, fishing and boating in the summer months. The primary objective of the York Sewer District is to protect the public health and environment from sources of pollution due to wastewater generation.

Energy Savings Wastewater treatment facilities are often one of the highest energy users in any community. The York Sewer District evaluates process upgrades and equipment selection with the goal of reducing energy consumption wherever possible. This includes implementation of a variety of energy-related improvements to provide long-term cost savings.

Wastewater 7-Step Treatment  Process

  1. COLLECTION SYSTEM Wastewater from homes and businesses travels through a network of underground pipes by gravity
  2. PUMP STATIONS 15 pump stations throughout York pump wastewater to the wastewater treatment facility to be treated
  3. HEADWORKS Wastewater receives preliminary screening and grit removal treatment. Screened material and grit are disposed off-site
  4. AERATION TANKS Aerobic bacteria breaks down organic material and converts it to sludge, water and CO2
  5. CLARIFIERS Sludge settles to the bottom and clarified wastewater flows to a chlorine contact tank for disinfection.
  6. DISINFECTION Chlorine disinfects treated wastewater. Residual chlorine is removed, and clean effluent is discharged to Cape Neddick Harbor.
  7. DEWATERING Screw presses dewater the sludge. Dewatered sludge is conveyed to a truck and hauled off-site.

Wastewater Treatment  Facilities  System Overview Downloadable PDF 

This PDF can be printed on horizontally and double-sided on standard letter paper; it folds into three panels.

261020_YSD_Brochure_2.pdf

 

Collection System Pump Stations and GIS Map 

The GIS Mapping system is an integral tool in managing York's sewer system. Click GIS Mapping to zoom into additional levels of detail—the link will take you to the live map on the Town of York website.

Map of York, ME with highlighted sewer district lines along the coast and inland.

 

Plant and Equipment History 

Facility History

The Town of York has been a summer resort area for many years, and has seen moderate growth in both the year-round and seasonal populations. Since the mid-1980s these populations have increased substantially.

The original secondary treatment plant was constructed at the current site in 1975. It was designed to treat an average daily flow of 1.6 million gallons per day (mgd), a peak flow of 4.5 mgd, and an intended service lifetime of 20 years. Due to the increased population growth in the 1980's, flows to the facility reached design levels by 1990.

In 1990, the York Sewer District, which owns and operates the treatment facility, obtained the services of Wright-Pierce Engineers to design an upgraded facility at the existing site. In 1994, the new facility went online, providing treatment with an average flow of 3.0 mgd and a peak flow of 7.5 mgd.

The design and construction of the treatment facility was funded by a loan from the State Revolving Loan Fund (SRF). The SRF loans money for municpal facilities at an interest rate 2% below the current state bond bank level, provided all applicable state and federal regulations are followed. The York Sewer District borrowed approximately $6.8 million for design and construction of the facilities.

In order for the York Sewer District to provide treatment services to their current users, and provide capacity for growth within the Town of York, many components of the new treatment facility were replaced with larger, more efficient systems. Additionally, a new Process Building was constructed to house the new equipment.

Like the treatment plant constructed in 1975, the 1994 facilities incorporated a secondary treatment process to treat the incoming waste water. Biological activity breaks down the various components in the incoming waste system such that over 90% of the biochemical oxygen demand (BOD) and 90% of the total suspended solids (TSS) are removed.

Today, our facilities include: 

  • Headworks where large items in the waste stream are removed by a screening device, and grit is removed by a degritting system
  • Aeration Basins where mixed liquor and oxygen are combined with the waste stream to promote the biological treatment process 
  • Clarifiers where the mixed liquor settles to the bottom of the tank and clean effluent is discharged from the top
  • Chlorine Contact Tank where liquid chlorine is introduced to kill the bacteria and sodium bisulfite is introduced to remove excess chlorine

Support equipment for these processes, including several pumps and air blowers, are housed in the Control Building and the Process Building.

To keep the treatment system operating properly, a Supervisory Control and Data Acquisition (SCADA) system operated by a computer interface was included in the design. The SCADA system efficiently and automatically:

  • Adjusts equipment speeds to maintain preset levels
  • Provides feedback to the operator as to how the process is operating
  • Provides alarms for equipment malfunction or pending malfunctions
  • Stores data from the various instruments used to control the process for end of month reporting to the Department of Environmental Protection
Process Flow Technical Description and Diagram 

Process Flow Steps

A. Headworks In the headworks wastewater receives preliminary treatment by mechanical screening and grit removal prior to flowing to the aeration basins. Preliminary treatment is provided to protect the downstream piping and equipment from damage and plugging, and to reduce the quantity of grit collected in the aeration basins.

B. Aerations Basins From the headworks wastewater flows to the existing aeration basins where bacteria provide secondary treatment by breaking down wastes and converting it to cell mass (sludge), water and CO2. This biological treatment requires air which is introduced into the aeration blowers and fine bubble ceramic diffusers.

C. Clarifiers From the aerations tanks the wastewater flows to two new 70 foot diameter clarifiers each covered by an aluminum dome. In the clarifiers, sludge settles to the bottom of the tank and clarified wastewater flows out to the chlorine contact tank for disinfection. A portion of the settled sludge is pumped back to the aeration tanks to maintain the bacterial population and a portion is wasted to the sludge holding tanks.

D. Disinfection System From the clarifiers, treated wastewater (effluent) flows to the chlorine contact tank where liquid chlorine is introduced to disinfect the effluent. Before the disinfected effluent is discharged to the ocean in York Harbor, sodium bisulfite is added to remove any residual chlorine that was not used during the disinfection stage.

E. Sludge Pumps

  • Return Pumps The return sludge pumps return activated sludge from the clarifiers to the aeration basins. The sludge can be returned to the headworks, the aeration flow splitter box or directly to the aeration tanks.
  • Waste Pumps (existing) The waste sludge pumps waste excess sludge generated during the biological treatment of the wastewater and pump the sludge to the sludge holding tanks.
  • Screw Press Feed Pumps The screw press feed pumps feed the sludge stored in the sludge holding tanks to the screw presses which dewater the sludge prior to disposal.
  • Dewatering System The dewatering system is comprised of two screw presses, polymer feed, and a lime stabilization system. This system reduces the volume of sludge that must be disposed of.
  • Plant Water System The plant water system provides washwater to the screw press, to hydrants located around the treatment plant and to a foam control system located in the aeration tanks.
  • Influent Pumps The majority of the wastewater flow coming to the treatment facility is pumped to the plant by the Long Beach Pump Station. The gravity portion of the flow enters the treatment facility at the influent pump station where it is pumped to the headworks. In addition, screw press filtrate and spray wash water flows to the influent pump station.
  • Sludge Holding System Excess sludge generated during the biological treatment of the wastewater is wasted to the sludge holding tanks where the sludge is stored until it is dewatered by the screw presses. The sludge is aerated while it is stored to prevent odors and to further stabilize the sludge.